28.11.2010, 12:11
<!-- m --><a class="postlink" href="http://tehrantimes.com/Index_view.asp?code=231017">http://tehrantimes.com/Index_view.asp?code=231017</a><!-- m -->
Zitat:TEHRAN -- The second section of the second Iran-Turkmenistan gas transport pipeline will officially come on stream today.
...
“The second phase of the second Iran-Turkmenistan pipeline is a 500- kilometer long pipeline with a diameter of 48 inches. This pipeline has the capacity to transport 58 million cubic meters of gas per day,” Iran’s Deputy Oil Minister Javad Owji said here on saturday.
...